New Construction
| Fee Schedule
The purpose of this information is to
acquaint you, our customer-owners, with the PUD's policy
regarding charges for primary distribution line extension
and service installation. The following is a general
summary only. You are encouraged to consult the Engineering
Department concerning charges for your specific project.
The cost of line extensions away from existing improved
public roads is borne by the customer. Charges for
the primary and secondary cable system are based on
the estimated cost of the installation. Charges include
the cost of labor, transportation, material, overheads
and other customary costs included in construction.
The installed cost of the transformer(s), services
and meters is deducted. In the case of facilities installed
for temporary use, the customer pays the estimated
cost of line removal as well as installation. The line
extension fee is required before PUD construction crews
are scheduled.
Underground Line Extension for Major Project
or PLAT
The customer typically furnishes trenching, conduit,
backfill, vaults and in some cases, service lateral
conductor and/or conduit, and transformer vaults.
Irrigation
 |
Underground services are customer
provided and owned. |
 |
PUD may provide overhead service
at our discretion. |
 |
No installation fee. |
Service Fees
This is the revised service fee schedule
that Franklin PUD uses and is a template for typical
services. Altered services could vary, so it is best
to consult with one of our field engineers on the specifics
of your project. Call Engineering at (509)
547-0556 for
further assistance.
Questions? Please contact
our Engineering Department
1411 West Clark Street
P.O. Box 2407
Pasco, WA 99302-2407
(509) 547-0556 or 1-800-638-7701
Application for Electrical Service
To authorize the Public Utility District No. 1 of Franklin
County to furnish your premises with electric energy,
please fill out our Application
for Electrical Service form .
Residential Underground Service Line Extension
Guide
(GUIDELINES, DWG. NO. 220.1, 220.2)
 |