CONTACT US

E:
franklin@franklinpud.com
P:
509.547.5591
A:
1411 W. Clark Street Pasco, WA 99301
Employee Directory
Report an Outage

Broadband

Irrigation Services

The following information is to assist you, our customer-owners. The following needs to be provided:

  • A plot plan showing your preferred fencing and transformer location(s).  PUD will work out the actual transformer location together as we finalize the engineering plans.
  • Service voltages desired.
  • Total connected load in kW, broken down into requirements for Pump motors (along with their size), etc.
  • Estimated demand in kW.
  • Projected growth in electrical power requirements in kW in the next few years.
  • Size and type of service wire to be installed.

Call the Engineering office at 547-0556 for an appointment to review your plans with a field engineer.

PUD may provide 3 phase, 240/480-Volt service to 480-Volt circle motor loads when it is available. Franklin PUD STRONGLY recommends that you install "Phase Failure Protection" on your 3-phase service equipment to protect your pump motors.

Irrigation Services