Net Metering

Net metering measures the difference between the electricity you buy from us and the energy you generate using your own solar or wind equipment. Many small generating systems are easily available and benefit the environment.  You will be charged for the amount of energy that you purchase from Franklin PUD.

If you decide to install a small net metering project, you will need to meet all applicable codes and standards, obtain Franklin PUD approval, obtain an approved Washington State L&I electric inspection, and sign a net metering agreement before we install the new meter.

Net Metering Interconnection approval is not approval for production incentive payments under the State Renewable Energy System Cost Recovery Program (82.16.RCW).  Franklin PUD will not approve applications for the state incentive unless we are certain of our ability to pay.  Renewable energy systems will be given priority for future payments based on the order in which they received contingent approval of net meter interconnection applications from our Engineering Department.  Please call Todd Blackman at 509-546-5946 or Linda Esparza at 509-542-5910 if you have questions about the state-funded incentive program.

If you are considering a net metering project, please review the Customer Internconnection Standards below, and then contact our Engineering Department at 509-547-0556.

Rules for Customer Interconnection