Engineering & Contractors
Phase failure protection on your 3-phase service is highly recommended to protect
your pump motors”
Irrigation Services
To get started with your electrical service, we’ll need:
- A site plan with your preferred fence and transformer locations (we’ll finalize the
transformer placement together). - The service voltage you require.
- Your total electrical load in kW, with details on any pump motors and their sizes.
- Your estimated maximum power demand in kW.
- Your anticipated growth in electrical needs (in kW) over the next few years.
- The size and type of service wire you intend to install.
Protect Your Equipment: For 3-phase service, Franklin PUD STRONGLY URGES you
to install “Phase Failure Protection” to prevent damage to your pump motors.

Additional Resources
Understand the irrigation service requirements and view/download our request for service document.
Request for Irrigation Service– fillable application