Irrigation Services

To get started with your electrical service, we’ll need:

  • A site plan with your preferred fence and transformer locations (we’ll finalize the
    transformer placement together).
  • The service voltage you require.
  • Your total electrical load in kW, with details on any pump motors and their sizes.
  • Your estimated maximum power demand in kW.
  • Your anticipated growth in electrical needs (in kW) over the next few years.
  • The size and type of service wire you intend to install.

Protect Your Equipment: For 3-phase service, Franklin PUD STRONGLY URGES you
to install “Phase Failure Protection” to prevent damage to your pump motors.

Additional Resources

Understand the irrigation service requirements and view/download our request for service document.