Meter Requirements

The following are general requirements only, we encourage customers to consult with Engineering or the Meter Shop before you purchase and install your meter equipment.

General Provisions

Grounds: Bond all meter sockets and CT enclosures to customer ground in accordance with the National Electrical Code (NEC).

Meter Location:  Check with Engineering before equipment is installed. 

Meters shall be:

  • Front (roadside) or side exterior wall of the building within 6 feet from front of the building.
  • Accessible to FPUD personnel on a 24-hour basis.
  • Height to center of meter shall be at or between 4’6” and 5’6” above construction and final grade.
  • In developments with existing facilities along a rear lot line, verify the meter location with Engineering.
  • Other locations will be at the discretion of FPUD.  Permission needs to be in writing.

Non-Residential Underground Services: If underground conductor is customer-owned, customer or customer representative makes up service conductor connections in CT can. FPUD will mount CT’s and make meter connections.

Single Family Residential Underground Services: The underground service conductor is owned and installed by FPUD.  For installations above 400 A, FPUD provides service connections and CT installation in the enclosure.