Service Installation Fee
New and Altered Service Request Application Fees
Expend the sections below to review service installation fees for each service type.
Residential
Single - Phase, 400A or less with self- contained meter | $150.00 |
Single - Phase, up to 800A CT meter | $200.00 |
Commercial/Industrial/Irrigation
Single - Phase, 200A or less with self-contained meter | $150.00 |
Single - Phase, up to 800A CT Meter | $200.00 |
Three Phase | $300.00 |
Primary Meter | Franklin PUD Cost |
Excess Secondary Cable - In excess of 100 feet:
Overhead | $1.15 per foot |
Underground | $3.35 per foot |
Residential Subdivisions
0 - 10 Lots | $500.00 |
11-20 Lots | $1,000.00 |
21-50 Lots | $2,500.00 |
Greater than 50 Lots | See Note* |
*Note: Please contact the Engineering Department |
Meter Installation
Self - contained meter (1 Phase) | $195.00 |
Self - contained meter (3 Phase) | $340.00 |
Current transformer CT meter (1 Phase) | $840.00 |
Current transformer CT meter (3 Phase) | $1,400.00 |
Secondary Service Installation
Single - Phase, 400A, or less with self-contained meter: | |
Overhead | $315.00 |
Underground | $935.00 |
Metered Temporary Service - $200.00, plus metered energy used
System Capacity Fee - Residential
Single - Phase, 400A or less with self-contained meter | $1,750.00 |
Single - Phase, up to 800A CT meter | $2000.00 |
System Capacity Fee - Commercial/Industrial/Irrigation
Single - Phase, 200A or less with self - contained meter | $2,500.00 |
Single - Phase, up to 800A CT Meter | $3,500.00 |
Three - Phase, 120/208V | $15.00 per Amp |
Three - Phase, 277/480V | $35.00 per Amp |
Primary Meter | Franklin PUD Cost |