Service Installation Fees
Service Installation Fees
Service Installation Fees & Other Charges
New and Altered Service Request Application Fees
|
|
Residential |
|
Single - Phase, 400A or less with self- contained meter |
$150.00 |
Single - Phase, up to 800A CT meter |
$200.00 |
|
|
Commercial/Industrial/Irrigation |
|
Single - Phase, 200A or less with self-contained meter |
$150.00 |
Single - Phase, up to 800A CT Meter |
|
$200.00 |
Three Phase |
$300.00 |
Primary Meter |
Franklin PUD Cost |
Excess Secondary Cable - In excess of 100 feet: |
|
Overhead |
$1.15 per foot |
Underground |
$3.35 per foot |
Residential Subdivisions |
|
0 - 10 Lots |
$500.00 |
11-20 Lots |
$1,000.00 |
21-50 Lots |
$2,500.00 |
Greater than 50 Lots |
See Note* |
*Note: Please contact the Engineering Department |
|
Meter Installation |
|
Self - contained meter (1 Phase) |
$195.00 |
Self - contained meter (3 Phase) |
$340.00 |
Current transformer CT meter (1 Phase) |
$840.00 |
Current transformer CT meter (3 Phase) |
$1,400.00 |
Secondary Service Installation |
|
Single - Phase, 400A, or less with self-contained meter: |
|
Overhead |
$315.00 |
Underground |
$935.00 |
Metered Temporary Service - $200.00, plus metered energy used |
System Capacity Fee - Residential |
|
Single - Phase, 400A or less with self-contained meter |
$1,750.00 |
Single - Phase, up to 800A CT meter |
$2000.00 |
System Capacity Fee - Commercial/Industrial/Irrigation |
|
Single - Phase, 200A or less with self - contained meter |
$2,500.00 |
Single - Phase, up to 800A CT Meter |
$3,500.00 |
Three - Phase, 120/208V |
$15.00 per Amp |
Three - Phase, 277/480V |
$35.00 per Amp |
Primary Meter |
Franklin PUD Cost |