Service Installation Fees

Service Installation Fees

Service Installation Fees & Other Charges

New and Altered Service Request Application Fees   

 
Residential    
Single - Phase, 400A or less with self- contained meter $150.00
Single - Phase, up to 800A CT meter $200.00
   
Commercial/Industrial/Irrigation  
Single - Phase, 200A or less with self-contained meter $150.00
Single - Phase, up to 800A CT Meter
$200.00
Three Phase $300.00
Primary Meter Franklin PUD Cost
Excess Secondary Cable - In excess of 100 feet:    
Overhead  $1.15 per foot
Underground $3.35 per foot    
Residential Subdivisions  
0 - 10 Lots $500.00               
11-20 Lots $1,000.00
21-50 Lots $2,500.00
Greater than 50 Lots See Note*
*Note: Please contact the Engineering Department  
Meter Installation  
Self - contained meter (1 Phase) $195.00
Self - contained meter (3 Phase) $340.00
Current transformer CT meter (1 Phase) $840.00
Current transformer CT meter (3 Phase) $1,400.00      
Secondary Service Installation  
Single - Phase, 400A, or less with self-contained meter:  
Overhead $315.00                 
Underground $935.00                
Metered Temporary Service - $200.00, plus metered energy used
System Capacity Fee - Residential  
Single - Phase, 400A or less with self-contained meter $1,750.00              
Single - Phase, up to 800A CT meter $2000.00            
System Capacity Fee - Commercial/Industrial/Irrigation     
Single - Phase, 200A or less with self - contained meter $2,500.00  
Single - Phase, up to 800A CT Meter $3,500.00
Three - Phase, 120/208V $15.00 per Amp  
Three - Phase, 277/480V $35.00 per Amp
Primary Meter Franklin PUD Cost